Processlow and main construction methods of stainless steel glass handrail bracket

Processlow and main construction methods of stainless steel glass handrail bracket

  • Post author:
  • Post category:Uncategorized
  • Post comments:0 Comments
  • Post last modified:May 12, 2021

stainless steel glass handrail bracket1, process flow:Construction preparation-lofting → blanking → welding installation → grinding-→ welding seam inspection-→ polishing → painting.


2. Main construction methods
(1) Before construction, site lofting should be carried out, and the length of various rods should be accurately calculated.
(2) Accurately cut the material according to the length of the various rods, and the entire floor is hoisted to ensure the railings
The lines are on the same vertical surface, and the allowable deviation of the blanking length of its components is 1mm.

Leave a Reply